Plas-Tech Tooling Inc., Garner (Design/Build)

Henkel Construction Company and Accord Architecture (as Design-Build partners) completed a 20,000 square foot pre-engineered metal building for Plas-Tech Tooling Inc.’s existing production machining and plastic injection molding facility in Garner, Iowa. They’re using their new space for shipping and receiving, staging, and expanded production.

  • Gallery Image
  • Gallery Image
  • Gallery Image
  • Gallery Image
  • Gallery Image
  • Gallery Image